High-Luminosity LHC Gallery
Civil engineering for the High-Luminosity LHC (HL-LHC) 2018
(Image: CERN)
Civil engineering for the High-Luminosity LHC (HL-LHC) 2018
(Image: CERN)
CERN Director-General Fabiola Gianotti places the time capsule at point 1 of the LHC.
(Image: CERN)
CERN Director-General Fabiola Gianotti places the time capsule at point 5 of the LHC.
(Image: CERN)
Point 1 of the LHC.
(Image: CERN)
New CCT Magnets in 927
(Image: CERN)
New CCT Magnets in 927
(Image: CERN)
Installation of the crab cavity test facility for Hugh Luminosty LHC finalized in the SPS tunnel (BA4).
(Image: CERN)
HighLuminosity LHC CRAB Cavitiy installation for testing with beam in the SPS tunnel (BA6)
(Image: CERN)
ID:
CERN-PHOTO-201805-131-1
Civil engineering for the High-Luminosity LHC (HL-LHC) 2018
2018-05-31
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN
ID:
CERN-PHOTO-201805-131-2
Civil engineering for the High-Luminosity LHC (HL-LHC) 2018
2018-05-31
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN